WORKS CARRIED OUT

Works carried out for TGN (Transportador de Gas del Norte), ECOGAS and Camuzzi Gas Pampeana.

Work carried our for TGN (Transportadora de Gas del Norte):

  • Replacement of pneumatic panels for electro pneumatic equipment with GPRS communication.
  • Number of units installed: 43 units.
  • Location: Gasoducto Norte

Work carried out for ECOGAS:

  • Replacement of pneumatic panels for electro pneumatic equipment with GPRS communication.
  • Number of units installed: 27 Units.
  • Location: Distribuidora de Gas Cuyana S.A. (Mendoza, San Juan, San Luis).

Work carried out for Camuzzi Gas Pampeana:

  • Electronic control boards for regulatory plants, with telephone call system and SMS.
  • Units delivered for this project: 45 units.
  • Location: Province of Buenos Aires.