WORKS CARRIED OUT
Works carried out for TGN (Transportador de Gas del Norte), ECOGAS and Camuzzi Gas Pampeana.
Work carried our for TGN (Transportadora de Gas del Norte):
- Replacement of pneumatic panels for electro pneumatic equipment with GPRS communication.
- Number of units installed: 43 units.
- Location: Gasoducto Norte
Work carried out for ECOGAS:
- Replacement of pneumatic panels for electro pneumatic equipment with GPRS communication.
- Number of units installed: 27 Units.
- Location: Distribuidora de Gas Cuyana S.A. (Mendoza, San Juan, San Luis).
Work carried out for Camuzzi Gas Pampeana:
- Electronic control boards for regulatory plants, with telephone call system and SMS.
- Units delivered for this project: 45 units.
- Location: Province of Buenos Aires.










